HIL and SIL lab for rentECU test lab near Stuttgart
Hardware-in-the-loop and software-in-the-loop need continuous power, cooling, a secure room and the team right next to it. At the PROJEKTCAMPUS in Heimsheim on the A8 all of this is already in place – no fit-out, from 1 month. About 8 minutes from the Porsche Development Centre Weissach and 8 km from Bosch Renningen.
Proven in practice
HIL test benches for ECUs are already running on campus, and one tenant operates an AI and compute lab with around 100 kW of continuous power across several meters. The infrastructure is not a promise on paper – it is in operation.
What an HIL lab needs – and what the campus offers
| Requirement | At the PROJEKTCAMPUS | |
|---|---|---|
| Continuous power | HIL racks, real-time computers, power supplies and load simulation often run around the clock | 25 kW per half-floor with its own meter, combinable – one tenant already runs around 100 kW |
| Cooling | Waste heat from racks in continuous operation | Capacity for power and cooling (approx. 12.5 + 12.5 kW per unit) |
| Secure room | ECUs, prototypes and data are confidential | enclosed, access-controlled and alarm-protected units, TISAX-compliant infrastructure |
| Access | Test runs overnight and at weekends | around the clock for lab tenants |
| Noise | Fans and air-conditioning units are not quiet | permitted on the floors |
| Data | Flashing, remote access, large measurement data | fibre from 4 carriers |
| Vehicle within reach | Checks on the real vehicle, vehicle-in-the-loop | vehicle halls with power and lift, 800 m test circuit on campus |
| Flexibility | Projects have terms, not decades | from 1 month, then cancellable monthly, no fit-out |
Suitable for ECUs and light hardware in racks. Complete vehicles are tested in the vehicle halls, not on the office floors.
Software-in-the-loop: compute power in your own server room
With SIL, virtual ECUs, regression tests and simulations run on servers – often thousands of test cases per night in the CI pipeline. If you compute this in the cloud, you pay for every hour; with growing test coverage and AI-generated test cases, costs keep rising.
- Your own simulation servers in the server room of the half-floor, with power and cooling
- Confidential models and source code stay in-house – important for customer contracts and TISAX
- HIL and SIL side by side: the same test automation drives virtual and real ECUs
Typical layout on a half-floor
200 m² for 5 to 20 people – office and lab on one level, short distances between desk and test bench:
As the project grows, further rooms, units or a vehicle hall can be added – without moving.
How to get your lab
- Request: number of racks, power in kW, people, start date
- Visit: see the half-floor, server room and vehicle halls on site
- Contract: from 1 month, then cancellable monthly – from €300 net per desk, power billed by your own meter
- Move in: set up the racks, connect, test – no fit-out and no new grid connection
Frequently asked questions
How much power does an HIL test bench need?
An HIL rack for ECUs with real-time computer, power supplies and load simulation needs roughly 1 to 5 kW in continuous operation, depending on the setup, plus cooling. With 25 kW per half-floor, several racks plus simulation servers can be run.
Can the lab grow with the project?
Yes. Units and meters can be combined – one tenant on campus already runs around 100 kW of continuous power. Further rooms, private offices or a vehicle hall can be added without moving.
What is the difference between HIL, SIL and MIL?
In model-in-the-loop (MIL) the control model is simulated, in software-in-the-loop (SIL) the real code runs on a PC or server, and in hardware-in-the-loop (HIL) the real ECU is connected to a real-time computer that emulates the vehicle and its environment. SIL mainly needs compute power; HIL also needs power, cooling and a secure room for ECUs.
Can test benches run around the clock?
Yes. Lab tenants have 24/7 access; test runs overnight and at weekends are possible. Fan and air-conditioning noise from the racks is permitted on the floors.
Is the lab suitable for confidential projects?
The units are enclosed, access-controlled and alarm-protected, and the infrastructure is TISAX-compliant. ECUs, prototypes and development data stay in your own area.
Can vehicles be tested as well?
Yes. The vehicle halls next door have power and a lift, and there is an 800 m test circuit on campus. Vehicle halls are rented in addition to an office unit.
How fast can an HIL lab start?
Power, cooling, fibre and the server room are in place – no fit-out and no new grid connection needed. After a visit and contract, the racks can move in within a few days. Rental from 1 month, then cancellable monthly.